Every time I opne a particular plan the floor manager goes back to the main floor and I tend not to notice and have a days work out of place - is there a way to lock and elevation or make an elevation default for a drawing?
↧
Every time I opne a particular plan the floor manager goes back to the main floor and I tend not to notice and have a days work out of place - is there a way to lock and elevation or make an elevation default for a drawing?