you have two ways to do that : first one is to get separate cut that the mechanical one and then attach it back )with gray presentation and line wight 0 ) to attach back to the mechanical drawing ,,then update sequence to reference to get the mechanical in front of arch ... the second is by getting to drawings from the same cut that cut should be through doors and windows , for mechanical the presentation will be cut forward and back are on and for architectural only cut and forward on , turn of all mechanical drawing form architectural one and vice versa ... to avoid the redundancy move the arch reference by 0.000001
↧